Oil
King Abdul-Aziz international airport development project-phase 1

King Abdul-Aziz international airport development project-phase 1

Design, Prefabrication and Site Erection of Atmospheric Tanks (vertical fixed or floating roof, horizontal) for storage of fuel products. The tanks are designed and fabricated in accordance to international codes (API 650 or EN 14015 )

Scope

Management, design, engineering, procurement, supply of equipment and materials,fabrication, fully assembly, testing, painting, calibrating, inspecting, preparation for shipment of sampling vessels

TECHNICAL DATA

Region-Country:
Middle East, Saudi Arabia
Location:
King Abdul-Aziz international airport
Project:
King Abdul-Aziz international airport development project-phase 1
Client:
AL-ASWAD TRADING AND CONTRACTING ESTABLISMENT
Date:
2015
BackDonwload Pdf
We use cookies to ensure we give you the best possible experience when you visit the Metron website. By choosing "I agree", you agree to receive all cookies (functionality, statistics). Read about our cookie policy.